Friday, April 26, 2024
HomeFCTTraffic Gridlock : FCTA To Mobilise Contractors Back To Site

Traffic Gridlock : FCTA To Mobilise Contractors Back To Site

The Federal capital Territory Administration (FCTA) has hinted that, it had perfected plans to mobilize contractors back to site.

Executive Secretary, Federal Capital Development Authority (FCDA) Umar Jibrin said the aim is to ease the perennial traffic gridlock along the Bwari- Dutsen roads axis.

Jibrin gave the hint when he led some top management staff of the Administration on an on the spot assessment of the road, noted that the project was impeded by the incessant rain fall ,but has to be completed to relieve residents of the stress.

He noted that the projects, involving full dualisation of the roads, were not abandoned as speculated by residents, but suffered some set back, due to the COVID 19 and some other challenges.

According to him; “works would resume on the roads within the next three weeks and commitment would be made to ensure its completion.

” When we say complition, we are talking of the totality of what needs to be done here.e have some drainage works to be done and other complimentary works.

” But the one that will satisfy the traffic movement is something that can be done in then next two months. In the next three weeks the contractor will demobilize here. We can never do anything where the rain is here.

He continued” We are only coming to appreciate the level at which the rain has impacted on the road. Now that we are going down, the rain is subsiding, the contractor had to come back and do this work in a very short time. The project is not abandoned. Everything is on cause, the contractor is on-ground”.

- Advertisment -

Most Popular

Recent Comments